Ontario Land Tribunal: Reforming an Overburdened System
- Mersedeh Andalibi
- Nov 8, 2025
- 4 min read

Explore how Ontario’s Land Tribunal has evolved into a system burdened by backlogs and inefficiencies — and what reforms are needed to restore transparency, accountability, and timely housing decisions.
1. Introduction
Ontario’s housing and infrastructure ambitions rely on a functional and efficient appeal system—yet the Ontario Land Tribunal (OLT), designed to streamline land-use disputes, now faces mounting criticism for inefficiency and centralization.
Established under the Ontario Land Tribunal Act, 2021, the OLT was intended to replace multiple adjudicative bodies with one streamlined process overseeing development, expropriation, heritage, and environmental appeals. However, the system’s limited capacity and complex procedures have produced significant delays, undermining its original purpose.
According to the Auditor General’s 2024 Value-for-Money Audit, the Tribunal had 1,490 active cases as of March 2024—an 8 % increase since 2021—and issued only 35 % of decisions within 30 days. The consequences ripple through Ontario’s housing market: stalled projects, inflated costs, and diminished confidence in both municipal and provincial planning systems.
2. Historical Context: From Oversight to Overreach
Ontario’s land-use tribunals have evolved through a century of reform attempts:
Ontario Municipal Board (1906 – 2018) – Originally created to supervise railways and municipal finances, later transformed into an appeal authority for zoning and planning. Over time, it drew criticism for overriding local councils and favouring development interests.
Local Planning Appeal Tribunal (2018 – 2021) – Formed under Premier Wynne’s government to return some power to municipalities and limit “de novo” hearings. It required consistency with official plans and provincial policy.
Ontario Land Tribunal (2021 – present) – Created under Premier Ford’s Accelerating Access to Justice Act, merging five separate bodies into one. While marketed as “streamlining,” it reduced specialization and transparency, leaving the OLT stretched thin.
What was meant to modernize the system has, in practice, diluted expertise and increased centralization—a trade-off that continues to challenge municipalities and developers alike.
3. The Current OLT Process
When a municipality fails to make a decision on a zoning or planning application within the prescribed time—or when a decision is appealed—the matter proceeds to the OLT.
The process includes:
1️⃣ Case Management Conference (CMC) — Identifies key issues, encourages settlement, and schedules timelines.
2️⃣ Mediation — A growing success story: the OLT’s 2022-23 Annual Report shows over 80 % of mediated cases reach settlement.
3️⃣ Hearing — Formal presentation of expert evidence and legal submissions.
4️⃣ Decision — Binding written ruling, often months or years after the initial filing.
While mediation has improved efficiency, hearings remain lengthy and costly, particularly for smaller municipalities and community groups without access to expert planning witnesses.
4. Structural Challenges
The OLT faces four major systemic weaknesses:
Backlog & Delay: Caseloads continue to grow faster than decisions can be issued, creating development uncertainty.
Loss of Expertise: Amalgamation reduced specialized adjudicative knowledge once available under separate boards.
Resource Inequality: Developers often outperform community or municipal appellants due to greater financial and legal resources.
Municipal Disempowerment: Local decisions reflecting community context are frequently overturned by a centralized tribunal focused on provincial growth targets.
The 2023 Auditor General’s Report also flagged excessive reliance on Minister’s Zoning Orders (MZOs) that bypass municipal consultation, compressing democratic oversight and pushing more conflicts into the already congested OLT system.
5. Case Examples
🏠 175 Cummer Avenue (Toronto)
Toronto’s plan for 59 modular supportive-housing units was appealed in 2022. Though the OLT dismissed the appeals, the process delayed construction nearly two years and tripled costs—from $14 million to $36 million—postponing urgently needed shelter beds.
🏗 Empire Communities v. City of Thorold (2024)
A zoning appeal concerning a 40-unit apartment project was partially approved after years of proceedings, with remaining issues still unresolved. The drawn-out process created uncertainty and drained municipal resources, illustrating how the OLT’s delays can paralyze planning frameworks.
6. Broader Implications
The OLT’s consolidation reflects Ontario’s top-down approach to housing delivery—enforcing provincial priorities like density and transit-oriented growth. Yet this approach sidelines place-based municipal realities such as infrastructure limits, heritage character, and community consultation.
At the same time, municipalities’ own delays and inconsistent planning decisions push too many files toward appeal. The backlog at the OLT is therefore both a symptom of municipal inefficiency and a product of provincial over-centralization.
7. Pathways to Reform
Experts and advocacy groups such as Tribunal Watch Ontario recommend:
Increased funding and adjudicator appointments to reduce backlog;
A triage and fast-track system for affordable-housing and non-profit projects;
Greater transparency through standardized decision reasoning;
Deference to municipalities when they demonstrate conformity with provincial policy;
Creation of an independent Adjudicative Tribunal Justice Council to ensure merit-based appointments and protect tribunal independence.
These reforms would strengthen both procedural fairness and housing outcomes, striking a balance between speed and accountability.
8. Conclusion
The Ontario Land Tribunal remains an essential but overburdened institution. Its delays undermine housing delivery, its structure limits municipal agency, and its opacity erodes public trust. Yet reform is achievable: more adjudicators, faster triage, and clear accountability can restore the Tribunal’s credibility.
For developers, municipalities, and property owners alike, early preparation and expert representation remain the key to navigating this complex system.